Lead concentrate ,lead concentrate price,lead silver concentrate
Lead concentrate ,lead concentrate price,lead silver concentrate
Pb min.55% , Typical 60%
Ag min.600 grams , Typical 1000 grams
Our underground mine produce approximately 150 tons of ore per month. The primary mining methods are cut and fill and longhole stoping. At Izmir, the ore is processed on site at a mill, which produces lead, zinc, and bulk concentrates.
Sample Code
Zn%
Pb%
Sn%
Fe%
L.O.I%
70
Not Detected
52.91
4.88
3.22
Not Detected
Pb min.55% , Typical 60%
Ag min.600 grams , Typical 1000 grams
Lead-Zinc ore : (Pb+Zn) 30%up and Ag 0.05%up
Lead concentrate : Pb 55%up and Ag 0.15%up
Zinc concentrate 50%up
Lead Concentrate
Ore is recovered by blasting then dumping, followed by crushing and finally hoisting to the surface for treatment. In mining, the ore is extracted by drilling or blasting and then crushed and ground. The ore is then treated using extractive metallurgy. The Froth flotation process separates the Lead and other minerals from the waste rock (tailings) to form a concentrate. The concentrate, which can range from 50% to 60% Lead, is dried and then treated using pyrometallurgy. The concentrate is sintered before being smelted in to produce a 97% Lead concentrate. The Lead is then cooled in stages which causes the lighter impurites (dross) to rise to the surface where they can be removed. The molten Lead bullion is then refined by additional smelting with air being passed over the Lead to form a slag layer containing any remaining impurities and producing 99.9% pure Lead.