we are sheet metal professional manufacturer engaged in precision sheet metal fabrication eg: meter box, cabinet,Bank self-service equipment, ATM machine, Safe cabinet, voltage inverter cabinet, charg...
Min. Order / Reference FOB Price | |
---|---|
5 Piece | US $5.00/ Piece |
Local Area: | Wuhan, Hubei, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, D/P, Paypal, Western Union |
Brand: | OEM, OEM |
---|---|
Place of Origin: | Shandong, China, shandong, China (Mainland) |
Brand Name: | OEM, OEM |
Model Number: | sheet metal fabrication, sheet metal |
picture
Product Description
laser cutting, bending welding and powder coating sheet metal fabrication
Product Detail
Color | Buyer's requirements |
Material | Steel |
Surface treatment | Powder Coated |
Usage | Industry |
Certification | CE |
Application | Indoor/outdoor |
Warranty | 1 Year |
Product Keywords | sheet metal |
1.Cutting,Bending, Punching, Drilling, Milling, Welding, Surface Treatment, and other processing procedures are all be done in factory.
2.With a 450 Meters long metal surface treatment line, and 300 more experienced workers.
3. Special anti-corrosion treatment and three times surface paint treatment;
4. Compliance with environmental standard requirements.
Packaging
Production Process
FAQ
FAQ
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent, pls call us or tell us in your email so that we will regard your inquiry priority.
2) How can I get a sample to check your quality?
After price /confirm/iation, you can require for samples to check our quality. We will provide you sample for free (value under USD15), as long as you afford the express freight.
3) How long can I expect to get the sample?
After you pay the sample charges(if there is) and send us confirmed drawings, the sample will be ready for delivery in 3-7 working days. The samples will be sent to you via DHL, FedEx,UPS,TNT or EMS. It should arrive in 3-5 workdays. You can use your own express account or prepay us if you don't have any account.
4) What about the leading time for mass production?
Honestly, it depends on the order quantity. Normally, 15 days to 20 days after your deposit if no tooling needed.